In StockClenviro MATRIX CLF4 Sewage Treatment System (up to 25 person)
Clenviro
Description
The Clenviro MATRIX CLF4 Sewage Treatment Plant provides an extremely safe, efficient, reliable and cost effective solution to sewage disposal. All MATRIX sewage treatment systems meet and exceed all Environment Agency and regulatory requirements for process efficiency and final effluent quality. There are no mechanical components within the treatment plant itself thereby ensuring that maintenance is minimal, simple and safe.
** ** ** **** MATRIX CLF 3 Line Drawing **
** Commissioning and Servicing Information **
Maintenance Requirements
De-Sludge Primary and Final Tank Every 12 Months
De-Sludge Biozone Every 24 months
Diaphragms in blower Replace every 18-24 Months
Please see manufacturer Manuel, page 18 for full maintenance guidelines.
** Domestic use only. For commercial applicants please call us on 01388 537050 so we can discuss your needs appropriately. **
Population equivalent 25 person
Offloading Customer Offloading
Diameter 2500mm
Outlet Size 110mm
Depth 1912mm
Inlet depth* 600mm
Lid Size 900mm²
Delivery Free Delivery
Tank Use Sewage Below Ground
BOD/day Kg 1.50kg/day
Flow/day m³ 3.75m3/day
Weight 750kg
Blower rating 120w/240v
De-Sludge frequency (approx.) 12 months
Pipework 110mm
*Deeper inverts can be accommodated upon request.
MATRIX CLF4 Benefits
-
Free Delivery
-
25 Year Structural Warranty
-
2 Year Blower Warranty
-
Price INCLUDES blower, discharge pump failure alarms and pedestrian duty cover
Fully tested and CE certified to ** BSEN12566-3 **
** **Failure alarm systems and blower included as standard at no additional cost
-
Robust Polypropylene construction for easy and cost effective installation
-
No visual impact
-
Simple installation
-
Low Running and maintenance costs
Integral discharge pumps where required (all models) no additional tank
- Deep inlet inverts available to avoid pumping crude sewage to plant
A Standard Commissioning carried by an RA Dalton Ltd accredited Engineer will include the following:
-
Carry out visual checks of the installation
-
Check the installation meets the manufacturer’s requirements, installed within their guidelines
-
Check all mechanical components
-
Check blower pressure, air hose, (aeration only)
-
Check clean air intake to blower housing/kiosk (aeration only)
-
IPS Models – check and test integrated pump
-
Test and set any alarms supplied with the unit (PPFDS, high Level Float)
-
Make any minor adjustments
-
Make any final connections
-
Provide a commissioning certification
On completion, RA Dalton will provide a site specific commissioning certificate
PLEASE NOTE: WE WILL ASK THAT A PRE COMMISSIONING CHECKLIST IS COMPLETED PRIOR TO ARRANGING ATTENDANCE TO ENSURE THE LEVEL OF COMMISSIONING REQUIRED IS STANDARD
More from Direct Drainage
View all
In Stock-9%Klargester BA/BA-X/BB BioDisc Motor and Gearbox | 1015023
Kingspan Klargester
In Stock-40%Secoh SE30 JDK 40-50 Filter for Secoh Blowers
Secoh
In Stock-32%BC BioDisc ½” Duplex Chain with Link – 5ft
Kingspan
In Stock-47%