Skip to content
Clenviro MATRIX CLF4 Sewage Treatment System (up to 25 person)In Stock
Direct DrainageTrade & retail

Clenviro MATRIX CLF4 Sewage Treatment System (up to 25 person)

Clenviro

£6,945.00£7,860.00-12%
Apply for trade pricing at Direct Drainage

Description

The Clenviro MATRIX CLF4 Sewage Treatment Plant provides an extremely safe, efficient, reliable and cost effective solution to sewage disposal. All MATRIX sewage treatment systems meet and exceed all Environment Agency and regulatory requirements for process efficiency and final effluent quality. There are no mechanical components within the treatment plant itself thereby ensuring that maintenance is minimal, simple and safe.

MATRIX Installation Manual

** ** ** **** MATRIX CLF 3 Line Drawing **

** Commissioning and Servicing Information **

Maintenance Requirements

De-Sludge Primary and Final Tank Every 12 Months

De-Sludge Biozone Every 24 months

Diaphragms in blower Replace every 18-24 Months

Please see manufacturer Manuel, page 18 for full maintenance guidelines.

** Domestic use only. For commercial applicants please call us on 01388 537050 so we can discuss your needs appropriately. **

Population equivalent 25 person

Offloading Customer Offloading

Diameter 2500mm

Outlet Size 110mm

Depth 1912mm

Inlet depth* 600mm

Lid Size 900mm²

Delivery Free Delivery

Tank Use Sewage Below Ground

BOD/day Kg 1.50kg/day

Flow/day m³ 3.75m3/day

Weight 750kg

Blower rating 120w/240v

De-Sludge frequency (approx.) 12 months

Pipework 110mm

*Deeper inverts can be accommodated upon request.

MATRIX CLF4 Benefits

  • Free Delivery

  • 25 Year Structural Warranty

  • 2 Year Blower Warranty

  • Price INCLUDES blower, discharge pump failure alarms and pedestrian duty cover

Fully tested and CE certified to ** BSEN12566-3 **

** **Failure alarm systems and blower included as standard at no additional cost

  • Robust Polypropylene construction for easy and cost effective installation

  • No visual impact

  • Simple installation

  • Low Running and maintenance costs

Integral discharge pumps where required (all models) no additional tank

  • Deep inlet inverts available to avoid pumping crude sewage to plant

A Standard Commissioning carried by an RA Dalton Ltd accredited Engineer will include the following:

  • Carry out visual checks of the installation

  • Check the installation meets the manufacturer’s requirements, installed within their guidelines

  • Check all mechanical components

  • Check blower pressure, air hose, (aeration only)

  • Check clean air intake to blower housing/kiosk (aeration only)

  • IPS Models – check and test integrated pump

  • Test and set any alarms supplied with the unit (PPFDS, high Level Float)

  • Make any minor adjustments

  • Make any final connections

  • Provide a commissioning certification

On completion, RA Dalton will provide a site specific commissioning certificate

PLEASE NOTE: WE WILL ASK THAT A PRE COMMISSIONING CHECKLIST IS COMPLETED PRIOR TO ARRANGING ATTENDANCE TO ENSURE THE LEVEL OF COMMISSIONING REQUIRED IS STANDARD

More from Direct Drainage

View all